This action includes a preliminary study for implementing Nature-Based Solutions (NBS) for sustainable water management, drought risk reduction, and aquifer replenishment in the area where the now-drained lake Xyniada was.
The technical works include dredging, cleaning, and widening of the drainage streambeds in the area to improve water retention and infiltration.