This action includes a study on the typology, location, construction, and effectiveness assessment of Nature-Based Solutions (NBS) to reduce flood risks at the Drimatorema site in Lianokladi, upstream of the existing overflow outlet.
The pilot aims to manage floods, raise public awareness on flood risks, implement measures for public information and preparedness, and promote appropriate land uses.